Temporary Route Changes for Two Trains on El-Qabari – Marsa Matrouh Line Due to High-Speed Electric Rail Project
Egypt's National Railways Authority has announced temporary route changes for two trains operating on the "El-Qabari – Marsa Matrouh" line, effective from Friday evening. These adjustments coincide with ongoing construction work for the high-speed electric rail project in the Al-Ruweisat area, a major national infrastructure initiative designed to modernize public transportation and connect governorates via a state-of-the-art rail network.
Construction Scope and Impact on Rail Operations
The authority explained that the work involves rerouting the railway tracks between kilometer markers 72/350 and 74/350, scheduled to take place from 7:15 PM until 12:15 AM, spanning five consecutive hours. These activities are part of the project's engineering safety protocols, ensuring the structural integrity of the new high-speed line while minimizing disruption to existing services.
Detailed Schedule Changes for Trains 656 and 943
Under the announced modifications, train No. 656 "Moharam Bek – Al-Dabaa" will have its route shortened, terminating at Al-Hammam station instead of its usual Al-Dabaa destination. Meanwhile, train No. 943 "Marsa Matrouh – Cairo" will depart 30 minutes later than scheduled, leaving Marsa Matrouh station at 9:30 PM instead of the regular 9:00 PM departure time.
The authority emphasized that these measures are strictly temporary and implemented to secure train movements during the construction phase, ensuring the highest safety and security standards across the railway network. All arrangements were coordinated with relevant authorities to minimize passenger inconvenience and maintain operational continuity during the work window.
The National Railways Authority called on passengers to understand these temporary adjustments and adhere to the updated departure times until the planned work is completed and normal operations resume. This initiative reflects the authority's commitment to advancing railway services in line with Egypt's major national projects, prioritizing passenger safety while modernizing transport infrastructure for the future.
Related News
View All News
10 Used Cars Under EGP 1 Million in the Egyptian Market This October
Rising new car prices pushed buyers to the used market in Egypt, where 10 cars are available under EGP 1 million this October. A 2018 Renault Logan starts at EGP…
Egypt Cancels Fire Extinguisher and Triangle Requirement for Car Licensing — How Much You Save?
Egyptian traffic units eliminated the requirement to present a fire extinguisher, reflective triangle, and first aid kit when issuing or renewing vehicle licenses. Car owners save between 1,300 and 1,425…
Auto Ahram: A Trusted Platform for New and Used Car Prices in Egypt
Auto Ahram is a specialized website for new and used car prices in Egypt. It provides comprehensive coverage of prices for all makes and models. It is an essential reference…
New Presidential Directives to Ease Vehicle License Renewal, Saving Hundreds of Pounds
Media figure Hisham El-Ziny praised new presidential directives aimed at easing vehicle licensing procedures for cars and motorcycles in Egypt. Executive steps by the Ministry of Interior include simplifying procedures…
Safety Expert: Fire Extinguisher, Triangle, and First-Aid Kit Won't Be Mandatory in Licensing if Valid
Major General Dr. Ayman El-Dabaa, a traffic safety expert, stated that fire extinguishers, reflective triangles, and first-aid kits will not become mandatory under Egypt's updated licensing procedures as long as…